成在线人免费视频一区二区,婷婷视频基地,新男人的天堂在线观看,色七影院

您好,歡迎進入南京惠言達電氣有限公司網(wǎng)站!
一鍵分享網(wǎng)站到:
您現(xiàn)在的位置:首頁 >> 技術(shù)文章 >> miniBOOSTER惠言達增壓器HC2-5.0-B-1F笑容銷售
miniBOOSTER惠言達增壓器HC2-5.0-B-1F笑容銷售
瀏覽次數(shù):927發(fā)布日期:2020-07-03

HC2-F

Data:

 

HC2-F versions: 13 different intensification factors

PIN: 20–207 bar

PH: 800 bar maximum

PRETURN: As low as possible (return pressure to tank)

POUTLET: PH = (PIN – PRETURN) i (intensification)

Mounting: Flange, manifold system miniBOOSTER pattern

Weight: 1.2 kg.

 

Model versions:

A model = no dump valve
B model = with dump valve
G model = direct proportionally controlled

Material certificate 3.1 on request

Description

The HC2-F is a variant of the HC2 for flange mounting on the low pressure side. The entire pattern is a miniBOOSTER design. It is a compact unit weighing only 1.2 kg. It is ideal for use in a variety of applications where building and maintaining high pressure is required.

The HC2-F raises supplied pressure to a higher outlet pressure and automatically compensates for consumption of oil to maintain the high pressure. Adjustment of the outlet pressure is carried out by varying the supplied pressure.

Flow rates

Intensification factor
i
Max. intensified outlet flow
l/min
Max. inlet flow
l/min
1.23.58.0
1.54.212.0
2.03.212.0
2.22.912.0
2.52.713.0
2.82.513.0
3.22.515.0
4.02.014.0
5.01.614.0
6.61.313.0
9.00.913.0
13.00.612.0
20.00.312.0

Functions

The basic operation is illustrated in the function diagram. Oil is fed through the directional valve CV to the IN port, flowing freely through the check valves KV1, KV2 and DV to the high-pressure side H. In this condition maximum flow through the booster is achieved giving a fast-forward function.

When pump pressure is reached on the high-pressure side H, valves KV1, KV2 and DV will close. The end pressure will be achieved by the oscillating pump unit OP. The unit will automatically stall when end pressure on the high-pressure side H is reached. If a pressure drop on the high-pressure side exists due to consumption or leakage, the OP valve will automatically operate to maintain the end pressure.

Function diagram

2-105-01

Download

Dimensions

Dimension drawing 2-135-01

Download

Connection types

ConnectionIN / RH
1FFlange1/4" BSPP
2FFlange9/16-18 UNF